Infranaga
Green power-ready AI DC infra

Power-ready land for AI data centres across Asia-Pacific.

Infranaga takes sites from raw land to approved, grid-connected and contracted. We secure development approvals for AI data centres and renewable energy parks, then match each site with a data centre offtaker.

HQ Singapore Teams Australia · Malaysia · Indonesia
Infranaga dragon emblem
Our mission

Data centres that give back more to their communities than they take.

First-in-class ESG and PUE efficiency

We aim to set the benchmark for ESG performance and power usage effectiveness (PUE). Every site is designed around efficiency principles that minimise its draw on local power, water and land, so the community does not carry the resource burden of the data centre.

DESIGN PUE≤ 1.2
WATER (WUE)≤ 0.2 L/kWh

We promote liquid-cooled and air-cooled data centre architecture on closed-loop systems, avoiding evaporative cooling that draws on local water supplies.

Community-driven development

We plan each project around the benefits that flow down to landowners, stakeholders and the local community: work for local suppliers in the supply chain, local jobs, and skills training that keeps people employed in the region long after construction.

What we do

Four activities, one outcome: a site an operator can build on.

Domiciled in Singapore, with core team members covering Australia, Malaysia and Indonesia.

Land development approvals

Zoning, planning and grid-connection approvals for AI data centres and renewable energy parks across APAC, with active projects in Australia and Malaysia.

Securing DC offtakers

Matching power-ready sites with hyperscalers, colocation operators and neoclouds, and bringing them to committed offtake.

Edge AI data centres

Specialists in edge AI sites in secondary and frontier markets, positioned to serve the primary prime markets with inference capacity, power and land they can no longer offer.

Off-grid energy parks with AI DCs

Renewable generation and battery storage co-located with AI data centres, so compute is not held back by grid connection queues.

Footprint

Pipeline of data centre land acquisitions

Sites follow the subsea cable routes linking Singapore to Malaysia, Greater Jakarta and Australia's east coast.

HQ
Singapore
AUSTRALIA
Greater Sydney, Wollongong, Greater Melbourne, Geelong, regional NSW and VIC, Perth
MALAYSIA
Perak, Kuala Lumpur, Sarawak (Kuching, Bintulu)
INDONESIA
Greater Jakarta
Map of Infranaga's data centre land pipeline across Malaysia, Indonesia and Australia, following subsea cable routes from Singapore
Expert team

Every discipline a power-ready site needs, in one core team.

20+YEARS

Founder

Network location strategy and site selection, including dedicated data centre site selection.

25+YEARS

Environment, water and land

Environmental remediation, water and land management.

20+YEARS

Grid connection and design

Three specialists in grid connection and grid design across Australia and Malaysia.

15+YEARS

Data centre design and delivery

Data centre design and project management.

Sustainability and connectivity

Sustainability design and planning, plus water and fibre connectivity consultants.

Landowner and community engagement

Two specialists in landowner, stakeholder and community engagement.

Talk to us about a site, an offtake or an investment.

Infranaga Pte Ltd, Singapore

Sir Tien (ST) Ngang
Founder and Managing Partner
+61 428 161 676 st@infranaga.com
Infranaga © 2026 Infranaga Pte Ltd · Singapore